c2c-oerpscenario team mailing list archive
-
c2c-oerpscenario team
-
Mailing list archive
-
Message #14261
[Bug 709055] Re: [5.0] Error when confirming a production order with different UoM
Wrong Calculated Quantity
** Attachment added: "pic3.png"
https://bugs.launchpad.net/openobject-addons/+bug/709055/+attachment/1811805/+files/pic3.png
** Tags added: 5.0 maintenance
** Changed in: openobject-addons
Status: New => Confirmed
** Changed in: openobject-addons
Importance: Undecided => Low
** Changed in: openobject-addons
Assignee: (unassigned) => Anup (OpenERP) (ach-openerp)
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/709055
Title:
[5.0] Error when confirming a production order with different UoM
Status in OpenERP Modules (addons):
Confirmed
Bug description:
When I confirm a production order using an UoM different of the one used in the Bill of Material, the consumed quantities are the inverse of the ones I expect.
*How to produce the bug *
1.Define two UoMs : UN and CAR (1 x CAR = 20 x UN) => pic1.png
2. Define a BoM : [product A (1 UN)] + [product B (1 UN)] -> [product C(1 UN)] => pic2.png
3. Create a production order for 200 CAR of Product C.
Here we expect to consume 200*20=4000UN of A and B but when we confirm the production,
only 10UN (=200/20) are planned to be consumed. => pic3
References