To bring some objectivity to the behavior of ir_cron, I have developed a
very simple test (see attachment "ir_cron_test.py") and the expected
results (see attachment "serverlog.txt").
First, we have to agree, that the given test will produce the given
result.
If we agree, then I have to report, that neither V5 nor V6 nor
c2c_cron_audittrail will produce those results (each of them shows
different results).
This test focuses on concurrency, timing and priority of cron-jobs.
The test consists of two cron-jobs that run every minute ("frequent_quick") and three cron-jobs that run every ten minutes ("rare_slow") and last 270secs. The latter have the same starting time but different priority.
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/715418
Title:
[5.x] ir.cron - simultaneous start of cron jobs
Status in OpenERP Server:
New
Bug description:
We have not checked if this is fixed in v6
Batch-jobs defined via ir_cron may be started simultaneously/concurrently.
(We have seen up to 17 identical executions of the same job)
/base/ir/ir_cron.py starts timer (via netsvc.startTimer) without
checking, whether there is already a timer started for the same point in
time (or: without removing such simultaneous timers).
Hence, ir_cron._poolJobs will be invoked several times simultaneously.
I suggest to maintain a list of timers in /base/ir/ir_cron.py which
inhibits duplicate timers.
Alternatively "duplicate" timers could be removed - although this might
be difficult to implement.
Such a mechanism could also be implemented within netsvc.startTimer - on
the other hand: simultaneous jobs can also be useful (outside ir_cron).
When are jobs "simultaneous"?
I suggest to implement a "time-granularity" which is less or equal the
smallest granularity of ir_cron-Jobs, i.e. "minutes".
To be on the safe side for long-running jobs, the time-granularity may
also be the shortest interval currently defined via ir_cron (e.g. 10
minutes).
any ideas ?