c2c-oerpscenario team mailing list archive
-
c2c-oerpscenario team
-
Mailing list archive
-
Message #19267
[Bug 718722] Re: [PS] Manufacturing : raw material units should always be rounded up
Hello,
Thanks for Reporting.
It has been fixed in lp:~openerp-dev/openobject-addons/trunk-bug-718722-ron
Revision ID: ron@xxxxxxxxxxx-20110314131254-inohohq5tfgw32ey
Revision num:4531.
It will be available in trunk soon,
** Changed in: openobject-addons
Status: Confirmed => Fix Committed
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/718722
Title:
[PS] Manufacturing : raw material units should always be rounded up
Status in OpenERP Modules (addons):
Fix Committed
Bug description:
6.0.1
GTK and Web clients
- I've a BoM for 10 finished product which needs 1 component => I'm using a metal piece to manufacture between 1 or 10 rings.
- I round to 1 the products => whatever is the quantity produced between 1 and 10, I always need 1 metal piece.
- So if I produce 12, the system will use 1 plate (because I set rounding to 1) while I need 2 plates.
Solution : by default, the system should round up the consumed
quantity.
Francois Pietquin
OpenERP Professional Services
References