quite simple example with request for a simple answer:
MO
needed raw material = A / qty 100kg
raw material location: Nienburg, DE
production location: Grand-Rosiere, BE
raw material A needs to be moved WITH production lot from Nienburg to
Grand-Rosiere. I open picking list INT/xxxx (through 'extra information'
in MO), select an exicting production lot, process validate, print kind
of delivery note.
In Grand-Rosiere the workers find out: part of the raw material is not
useable - they scrap 20 kg through 'products to consume'
The qty in 'products to consume' stays the same: 100 kg - my stock level
for raw material A in location Grand-Rosiere is only 80 kg now.
What I miss: a new internal stock move from raw material location to
production location.
How would you solve this in your responsibility?
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/740120
Title:
[6.0] mrp MO : scrapping do not create new stock move
Status in OpenERP Modules (addons):
Invalid
Bug description:
When you scrap a product to consume, a new product to consume is
created. However, the stock move is not created. For example, raw
materials are in location A and product to consume in location B. When
you 'confirm production' a stock move from A to B is created. When you
scrap this product, it should recreate a new stock move from A to B.