OK, several things here:

We are improving manufacturing modules and we need not only managing
lots on consuming or produced for an order but also for materials
consumed and produced for an operation. We still did not begin working
on this but we will do for sure.

@steffi and @Michael: OpenERP is an impresive free, open and strong
functionality ERP. If you don't want using it, don't do. If you find
something to improve... 3 options: 1-Pay someone to build it, 2-Do it
yourself, 3-wait undefined time until someone does it for community.

@Olivier: I think you haven't got to be sorry or worried about this
comments. They can choose. They can work, they don't understand the open
source world.

About traceability control. For me it's right that there is 3 tracking
lot checkboxes. We discussed this also for 5.0. Imaging the case where
you don't want to register traceability on incoming but you need it on
outgoing (repairs on tech good, for instance). It's big problem
registering thousands of lines on incoming, but maybe it's right
capturing lot on outgoing to identify the computer or engine sold. So,
there is at less one industry where it's needed like it is now.

Sistem allows including prodlog on EVERY stock move you do, nevermind
the kind of movement, so the traceability functionality is right covered
in OpenERP. If you need making this assignement mandatory in a kind of
movement that is not covered, it's easy. Put another check on product
and inherit function to check this field every time a movement is going
to be made. So... even if it's not valid for you as it is now... it
would be clearly a wishlist.

Thank you:

Ana

-- 
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/670451

Title:
  [trunk] No support for forcing full traceability of production lot #
  in internal stock moves

Status in OpenERP Modules (addons):
  Confirmed
Status in OpenERP Addons 5.0 series:
  Won't Fix
Status in OpenERP Addons trunk series:
  Confirmed

Bug description:
  Product traceability works only in the simplest cases: When You buy product and sell them from the same location.
  But if internal moves or manufacturing operations are involved then traceability can't be guaranteed or even impossible.

  The one single reason for this is that there is no way to set "Tracking moves between physical locations" on products. You can track only incoming, outgoing and manufacturing LOTs: The ones from and to virtual locations but not between physical locations.
  Doing internal moves the system don't force the usage of LOTs even if all tracking options is checked for a product.

  The worst case is when You use mrp module for managing Manufacturing operations:
  Two sets of stock.move object is generated when You click on "Confirm Production" in a Manufacturing Order. One set is for Consuming Products on which You are forced to set LOTs (when "tracking manufacturing LOTs"  option is checked on the product). The other set of stock.move object (a picking list) is done behind the scenes. Since these (hidden) moves are internal moves and done automatically LOT assignment is not forced.

  The effect is that the system moves the raw materials from Stock to
  the Work Center Location without LOT. Then when the user tries to set
  LOTs on the products to consume (from the Work Center Location to the
  virtual Production location) a warning message is shown: "Bad LOT
  assignation. You are moving 5 products but only 0 available in this
  lot." The available quantity turns to negative and the shortage is
  increasing by every Manufacturing Order.

  The work around is to set the LOTs on both the products to consume and
  the internal picking list. But it's not forced by the system (so no
  guarantied) and is even a lot of unnecessary work. Imagine to do it on
  20 ingredients: 2x20=40 LOT assignment. You have to set the same LOT
  on every two related moves one by one. Double work for nothing to
  gain. But certainly it's not intuitive.

  Anyway I don't understand why are there 3 options for tracking LOTs?
  And it's even don't cover all the possibilities. So either there
  should be a 4th option to track internal moves or there should be only
  one to track all moves for a LOT (as in some other ERP systems)

  As I know LOT tracking is for traceability. So what is the purpose of
  the possibility of partial LOT tracking? (only incoming or only
  outgoing) What useful information can You get from them? For product
  traceability You need to track all LOT moves.

  While OpenERP is a promising product it's not yet usable in Food,
  chemical and pharma manufacturing industry where LOT management and
  full traceability is vital.

  In essence two development would be needed:
  1. Ability to track internal moves (Preferably with one single option on products for all LOT tracking)
  2. In Manufacturing orders to automatically copy the LOT attribute from the products to be consumed to the internal picking list. (So that the user should not have to repeat the LOT assignment and tracking would be guarantied)