** Changed in: openobject-addons
Status: Confirmed => In Progress
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/765901
Title:
[PS] stock : pull rule : wrong procurement method
Status in OpenERP Modules (addons):
In Progress
Bug description:
6.0.2
I've the following stock locations structure :
- Company 1
--- Stock 1
--- Ouput 1
- Company 2
--- Stock 2
--- Ouput 2
I have a product with the following settings :
- procurement type : stockable product
- procurement method : make to stock
- supply method : buy
On the same product, I add this pull rule :
- destination : stock 2
- origin : stock 1
- procurement method : make to order
If I sale a product from company 2, then I should have 2 stock moves
- from stock 2 to customer
- from stock 1 to stock 2
The problem is I don't get the second one!
Because the system checks first the procurement method defined on the product (and not the one set into the pull rule), it is expecting a minimum stock rule. So the algorythm isn't correct!
Normally, the system should check all the pull rules defined on the
product first : if a destination location (of a pull rule) matches
with the procurement then OpenERP should only uses the procurement
method defined on this rule. Then, if no pull rule is matching, the
system has to use the default values set under the first tab.
This bug has been VALIDATED BY QDP !
Thanks
François Pietquin