[Bug 770186] Re: 'Stock Simulation' calculation issue
Hi,
I dont understand well your question. I just make sure that the current
formula ( your (B) above ) is not right. I also gave my example.
About the formula (A) above,
(A) Stock Simulation = Initial Stock + Already In - Already Out + Incoming Left - Expected Out
I need to make clear some term definitions before saying it's right or not. These are
- Already Out
- Already In
- Confirmed Out
- Confirmed In
- Expected Out
The explanation in tool tips is vague. I can't distinguish them well.
- Already Out / Confirmed Out / Expected Out: what are differences? (in the context of current period)
- Already In / Confirmed In: what are diffirences?
If possible, please give me an example to these.
Thank you very much.
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/770186
Title:
'Stock Simulation' calculation issue
Status in OpenERP Modules (addons):
Incomplete
Bug description:
Hi,
I'm doing tests on MPS (stock_planning). The tip for calculation 'Stock Simulation' in current period is
(1) Stock Simulation = Initial Stock + Already In - Already Out + Incoming Left - Expected Out
However, module guide and actual calculation in current period is
(2) Stock Simulation = Initial Stock + Planned In - Planned Out
So there are 2 mistakes here. The first is consistent between guide
and actual calculation. This is small issue. The second is calculation
formula. Stock Simulation (stock at the end of current period) can't
be formula (2).
I dont know whether formula (1) is right or not. But I'm sure that
formula (2) is not right.
Regards.