But that is the point:
I have product A1
That is produced at the same time with product A, and A2
The BOM is for product A, and subproducts (not components) are A1 and A2
so I say that the BOM is that and no need for another.
Perhaps at the procurement_method should be make to stock for products A1 and A2? Because is produced anyway when product A is produced?
or supply_method should have a new value for products resulted from the same BOM?
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/797664
Title:
products defined as sub_products of a BOM are in exception
Status in OpenERP Modules (addons):
New
Bug description:
I have a BOM that has 2 sub_products (using the separate module sub_products)
when I use those subproducts in another bom as components, the system tries to make a procurement and results in an exception
No BOM for this product.
How can this be solved?