[Bug 730190] Re: Working times being ignored by workcenters for scheduling

 

Thanks a lot for reporting this bug and contributing to OpenERP. Unfortunately the OpenERP Web Client project is not going to be developed further after the 6.0 series. As of 6.1 a newer and better web frontend known as the OpenERP Web project[1] will be available.
Our R&D developers normally work in Launchpad to fix bugs for the next release, but there will be no next release for the current OpenERP Web Client. As our resources are limited, all further R&D efforts from the Web team are dedicated to finish the new 6.1 OpenERP Web project[1].
This bug will be closed as "Won't Fix" to show that R&D won't be able to work on it.

Bugs affecting customers in production of course continue to be handled via the OpenERP Enterprise (OPW) maintenance service, and this is the recommended way to have them corrected directly in the 6.0 LTS stable branch.
You can find more details about all of this in the FAQ of our Bug Management Policy documentation[2].

If you are interested, you should soon be able to beta-test the new
OpenERP Web 6.1 (this will be announced on OpenERP Community channels).

Thank you for your contributions and for your understanding!

[1] https://launchpad.net/openerp-web
[2] http://bit.ly/openerp-bugs-faq (FAQ #4)

** Changed in: openobject-client-web
       Status: Triaged => Won't Fix

-- 
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/730190

Title:
  Working times being ignored by workcenters for scheduling

Status in OpenERP Web Client:
  Won't Fix

Bug description:
  Tried on both 5.0.15 and 6.0.1 -

  Using OpenERP to schedule manufacturing in a machine shop

  I've setup working times of Monday-Friday, 07:00 thru 15:00

  Created my workcenters, assigned the working time to them.

  Create routings of approximately 7 workcenters in length.

  Create a BOM which assigns a routing to a particular product.

  Create a manufacturing order.  Check the schedule -

  If, for instance, I have a manufacturing operation with 16 hours, it
  loads a single day with 16 hours, rather than breaking it up to 2
  days.

  It also ignores non-work days (Sat and Sun)

  This is with mrp_operations and JIT scheduling installed (not sure
  which is causing this issue).

  I wouldn't exclude the possibility that I'm doing something wrong, but
  this is the only real hurdle from having a functional scheduling
  system for my shop, and it's a big one.

  I'm open to workarounds if there are any.