← Back to team overview

c2c-oerpscenario team mailing list archive

[Bug 670451] Re: [trunk] No support for forcing full traceability of production lot # in internal stock moves

 

hi,

Please find below the REGULATION (EC) No 178/2002 OF THE EUROPEAN
PARLIAMENT AND OF THE COUNCIL of 28 January 2002 laying down the general
principles and requirements of food law.


Chapter I

15. ‘traceability’ means the ability to trace and follow a food, feed,
food-producing animal or substance intended to be, or expected to be
incorporated into a food or feed, through all stages of production,
processing and distribution;

16. ‘stages of production, processing and distribution’ means any stage,
including import, from and including the primary production of a food,
up to and including its storage, transport, sale or supply to the final
consumer and, where relevant, the importation, production, manufacture,
storage, transport, distribution, sale and supply of feed;

source http://eur-
lex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:2002R0178:20090807:EN:HTML

-- 
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to OpenERP Project Group.
https://bugs.launchpad.net/bugs/670451

Title:
  [trunk] No support for forcing full traceability of production lot #
  in internal stock moves

Status in OpenERP Addons (modules):
  Confirmed
Status in OpenERP Addons 5.0 series:
  Won't Fix
Status in OpenERP Addons trunk series:
  Confirmed

Bug description:
  Product traceability works only in the simplest cases: When You buy product and sell them from the same location.
  But if internal moves or manufacturing operations are involved then traceability can't be guaranteed or even impossible.

  The one single reason for this is that there is no way to set "Tracking moves between physical locations" on products. You can track only incoming, outgoing and manufacturing LOTs: The ones from and to virtual locations but not between physical locations.
  Doing internal moves the system don't force the usage of LOTs even if all tracking options is checked for a product.

  The worst case is when You use mrp module for managing Manufacturing operations:
  Two sets of stock.move object is generated when You click on "Confirm Production" in a Manufacturing Order. One set is for Consuming Products on which You are forced to set LOTs (when "tracking manufacturing LOTs"  option is checked on the product). The other set of stock.move object (a picking list) is done behind the scenes. Since these (hidden) moves are internal moves and done automatically LOT assignment is not forced.

  The effect is that the system moves the raw materials from Stock to
  the Work Center Location without LOT. Then when the user tries to set
  LOTs on the products to consume (from the Work Center Location to the
  virtual Production location) a warning message is shown: "Bad LOT
  assignation. You are moving 5 products but only 0 available in this
  lot." The available quantity turns to negative and the shortage is
  increasing by every Manufacturing Order.

  The work around is to set the LOTs on both the products to consume and
  the internal picking list. But it's not forced by the system (so no
  guarantied) and is even a lot of unnecessary work. Imagine to do it on
  20 ingredients: 2x20=40 LOT assignment. You have to set the same LOT
  on every two related moves one by one. Double work for nothing to
  gain. But certainly it's not intuitive.

  Anyway I don't understand why are there 3 options for tracking LOTs?
  And it's even don't cover all the possibilities. So either there
  should be a 4th option to track internal moves or there should be only
  one to track all moves for a LOT (as in some other ERP systems)

  As I know LOT tracking is for traceability. So what is the purpose of
  the possibility of partial LOT tracking? (only incoming or only
  outgoing) What useful information can You get from them? For product
  traceability You need to track all LOT moves.

  While OpenERP is a promising product it's not yet usable in Food,
  chemical and pharma manufacturing industry where LOT management and
  full traceability is vital.

  In essence two development would be needed:
  1. Ability to track internal moves (Preferably with one single option on products for all LOT tracking)
  2. In Manufacturing orders to automatically copy the LOT attribute from the products to be consumed to the internal picking list. (So that the user should not have to repeat the LOT assignment and tracking would be guarantied)

To manage notifications about this bug go to:
https://bugs.launchpad.net/openobject-addons/+bug/670451/+subscriptions


References