← Back to team overview

credativ team mailing list archive

Re: [Bug 915481] Re: mrp, procurements: does not round up product qty on order

 

On 17/01/12 09:51, Ravish(OpenERP) wrote:
> Hello,
>
> I have faced the same problem that is after running procurement  "PO" takes 1 qty instead of 1.11 with same scenario
> because in float value rounding should be apply after 2 digit,so  as per my  opinion PO should be created for 1.11 qty.
>
> @ Dmitrijs : I do not  agree according your Expected results ,you have
> suggested that PO will take 2 qty but it shouldn't.because as a
> generalize  way the rounding applied after 2 digit, correct me If I am
> wrong .
>

Sure. The conditions are that:

* Enough or more product should be ordered
* Floor + minimal order qty increment

In my case the unit is PCE and I'm expecting integer rounding. If the 
orders can only be done in thousands and 3210 qty is required, it should 
be possible to configure rounding to round up to 4000.

>
> @Team: I have faced other issue that is, MO goes in to "Read to Produce" state after done the reception of one qty.It will consume only  1 qty (as per  virtual stock) but in MO it displayed correct qty (1.11)
>
>
> Thanks!
>

Thank you for trianging this.

> ** Changed in: openobject-addons
>         Status: New =>  Confirmed
>


-- 
With best regards,


Dmitrijs Ledkovs

credativ ltd                     Tel: 01788 298152
36 Regent Street                 Fax: 01788 298159
Rugby CV21 2PS - UK              http://www.credativ.co.uk

credativ Ltd is registered in England & Wales, company no. 5261743
Registered office: Nelson House, 2 Hamilton Terrace, Leamington Spa,
Warwickshire CV32 4LY

Certified by AccredIT UK with the ICT Supply standard of quality for
Software Product Design and Development

-- 
You received this bug notification because you are a member of OpenERP
Framework Experts, which is subscribed to OpenERP Addons.
https://bugs.launchpad.net/bugs/915481

Title:
  mrp, procurements: does not round up product qty on order

Status in OpenERP Addons (modules):
  Confirmed

Bug description:
  Using v6.0 addons revision 4996 with a demo database
  Using trunk addons revision  6339 with a demo database

  Steps to reproduce:
  in v6.0
  1) create new Bill of Materials with
  in trunk
  1) modify existing bill of Materials with

  - Product [RCK100] Rack 100cm
  - Product Qty: 9.00
  - Components:
     [LIN40] Wood Lintel 4m  x Product Qty 1.00

  = the rest is common =

  2) Create and confirm MO:
  - Product [RCK100] Rack 100cm
  - Product Qty: 10.00

  3) Run procurement schedular with automatic order point ticked.

  Expected results:
  MO consumed products: LIN40 qty 1.111
  PO quotation: LIN40 qty 2

  Actual results:
  MO consumed products: LIN40 qty 1.111
  PO quotation: LIN40 qty 1

  The bug:
  Even when the procurement will be completed there will not be enough stock to consume.

To manage notifications about this bug go to:
https://bugs.launchpad.net/openobject-addons/+bug/915481/+subscriptions


References