credativ team mailing list archive
-
credativ team
-
Mailing list archive
-
Message #04694
[Bug 915481] Re: mrp, procurements: does not round up product qty on order
Expected behaviour: after running procurement, I should have enough stock to complete manufacturing order.
Current behaviour: after running procurement, I sometimes do not have enough stock, due to rounding errors.
As per original description, and in every video above, procurement does
not order enough stock.
Think for the case where to manufacture 1 unit, I need square root of
two qty of a raw material. And think about batch of size
1,10,100,1000,10000,... Rounding precission will not solve it, Ceiling
upto N*(rounding precesion) will.
** Changed in: openobject-addons
Status: Opinion => Confirmed
--
You received this bug notification because you are a member of credativ,
which is subscribed to the bug report.
https://bugs.launchpad.net/bugs/915481
Title:
mrp, procurements: does not round up product qty on order
Status in OpenERP Addons (modules):
Confirmed
Bug description:
Using v6.0 addons revision 4996 with a demo database
Using trunk addons revision 6339 with a demo database
Steps to reproduce:
in v6.0
1) create new Bill of Materials with
in trunk
1) modify existing bill of Materials with
- Product [RCK100] Rack 100cm
- Product Qty: 9.00
- Components:
[LIN40] Wood Lintel 4m x Product Qty 1.00
= the rest is common =
2) Create and confirm MO:
- Product [RCK100] Rack 100cm
- Product Qty: 10.00
3) Run procurement schedular with automatic order point ticked.
Expected results:
MO consumed products: LIN40 qty 1.111
PO quotation: LIN40 qty 2
Actual results:
MO consumed products: LIN40 qty 1.111
PO quotation: LIN40 qty 1
The bug:
Even when the procurement will be completed there will not be enough stock to consume.
To manage notifications about this bug go to:
https://bugs.launchpad.net/openobject-addons/+bug/915481/+subscriptions
References