credativ team mailing list archive
-
credativ team
-
Mailing list archive
-
Message #04820
[Bug 915481] Re: mrp, procurements: does not round up product qty on order
*** This bug is a duplicate of bug 718722 ***
https://bugs.launchpad.net/bugs/718722
** Branch linked: lp:~credativ/openobject-addons/addons-syrup
--
You received this bug notification because you are a member of credativ,
which is subscribed to the bug report.
https://bugs.launchpad.net/bugs/915481
Title:
mrp, procurements: does not round up product qty on order
Status in OpenERP Addons (modules):
Confirmed
Bug description:
Using v6.0 addons revision 4996 with a demo database
Using trunk addons revision 6339 with a demo database
Steps to reproduce:
in v6.0
1) create new Bill of Materials with
in trunk
1) modify existing bill of Materials with
- Product [RCK100] Rack 100cm
- Product Qty: 9.00
- Components:
[LIN40] Wood Lintel 4m x Product Qty 1.00
= the rest is common =
2) Create and confirm MO:
- Product [RCK100] Rack 100cm
- Product Qty: 10.00
3) Run procurement schedular with automatic order point ticked.
Expected results:
MO consumed products: LIN40 qty 1.111
PO quotation: LIN40 qty 2
Actual results:
MO consumed products: LIN40 qty 1.111
PO quotation: LIN40 qty 1
The bug:
Even when the procurement will be completed there will not be enough stock to consume.
To manage notifications about this bug go to:
https://bugs.launchpad.net/openobject-addons/+bug/915481/+subscriptions
References