drizzle-merge team mailing list archive
-
drizzle-merge team
-
Mailing list archive
-
Message #00117
Re: Merge status
Thanks!
I'll take care of the rest. Have a great weekend!
On Oct 7, 2010, at 10:44 PM, Lee Bieber wrote:
> These two branches were just pushed to staging. That valgrind build failure was due to smtp not being installed on that machine
> • bzr merge lp:~brianaker/drizzle/unused-share-on-drop
> • bzr merge lp:~dshrews/drizzle/bug656474
> Padraig's branch is still waiting to be merged, it should be done by itself as we have had two tries but keep getting new valgrind warnings.
>
> That's all for now, not sure if I will have time in the morning to do anymore but will let you know if I do.
>
> Have a great weekend!
>
> -Lee
>
>
>
> Confidentiality Notice: This e-mail message (including any attached or
> embedded documents) is intended for the exclusive and confidential use of the
> individual or entity to which this message is addressed, and unless otherwise
> expressly indicated, is confidential and privileged information of Rackspace.
> Any dissemination, distribution or copying of the enclosed material is prohibited.
> If you receive this transmission in error, please notify us immediately by e-mail
> at abuse@xxxxxxxxxxxxx, and delete the original message.
> Your cooperation is appreciated.
>
References