Hi,

I'm looking to see if it'd make sense to replace rrdtool with graphite for graphing the server performance of the systems in the NTP Pool ( http://www.pool.ntp.org/ ).

I'm using 60 second retention intervals (I'll explain below), but only get 2-3 measurements an hour, so the graphs zoomed in are pretty spotty looking.  Is there a way around that:

http://dl.dropbox.com/u/25895/graphite/render-1d.png
http://dl.dropbox.com/u/25895/graphite/render-6h.png

Basically -- could the lines be made continuous between the plot points, even when the whisper data has a lot of "nulls".

The reason I have 60 second intervals is to be able to graph different measuring sources (that don't "go off" at the same time or even at quite the same intervals).  Also I'd like to be able to "turn up" the measurement intervals for debugging for a particular server for a period.