hugin-devs team mailing list archive
-
hugin-devs team
-
Mailing list archive
-
Message #02637
[Bug 830655] Re: OS X Hugin reassigns Completed PTBatcherGUI queue list processes
Tried to fix in 22bfc0556d70
** Changed in: hugin
Status: New => In Progress
--
You received this bug notification because you are a member of Hugin
Developers, which is subscribed to Hugin.
https://bugs.launchpad.net/bugs/830655
Title:
OS X Hugin reassigns Completed PTBatcherGUI queue list processes
Status in Hugin - Panorama Tools GUI:
In Progress
Bug description:
This bug occurs in OS X Hugin. Hugin reassigns completed stitch
processes listed in the PTBatcherGUI queue list to the active project
stitch settings for those completed processes that match the active
Project name and when any of the Hugin Stitcher controls have received
a changing user input subsequent to executing the previous stitch
process. Some examples are changing the state (even then restoring to
the previous state) for Projection, Size or Output format settings
(including Quality) or checking and unchecking a Panorama Output check
control. The status for all these reassigned processes changes to
Waiting and PTBatcherGUI reprocesses them according to the changed
settings in a normal fashion prompting to overwrite any existing
outputs. The bug changes the PTBatcherGUI queue list moments before
the “Specify output prefix” dialog box appears. The workaround it to
clear the PTBatcherGUI queue after a stitch is complete.
To easily observe this bug use a small file image, two image project.
Call it project A. Make a stitch named QQQ. Without clearing any of
the PTBatcherGUI list make another identical stitch named WWW.
Position the PTBatcherGUI window so that Status column will be visible
at all times. Change any Hugin Stitcher setting. Start another stitch.
Observe the change to the PTBatcherGUI list Status column prior to
naming this last stitch EEE. Save the Hugin Project A and save-as it
to be Project B. Perform similar tests as for Project A but use
different output names. You should see only the Project B list entries
being reassigned. Close out Project B and reload Project A. Again
perform similar tests. This time you should see only the Project A
list entries being reassigned.
This behavior was observed in OS X 10.6.8 Intel and OS X 10.5.8 PPC or
Hugin-2011.2.0_rc3. Similar behavior was observed on a Tiger Intel
system when testing prior versions of Hugin that first introduced the
send to PTBatcherGUI method of performing all batch processes.
To manage notifications about this bug go to:
https://bugs.launchpad.net/hugin/+bug/830655/+subscriptions
References