Thread Previous • Date Previous • Date Next • Thread Next |
Filled Draw Polygon on Top Paste layer has no need to network connection. Pad in pad is some mess too. connection onto other side should be made by vias, not pads.Pads 50 are there only to paste stencil format. But both Bottom and Top pad are number 49 that in schecmatic is connected to GND.
-- Best Regards, LordBlick
Thread Previous • Date Previous • Date Next • Thread Next |