linaro-project-management team mailing list archive
-
linaro-project-management team
-
Mailing list archive
-
Message #00017
Re: Pilot project with Gantt
On 1 Dec 2010, at 17:19, James Westby wrote:
> On Fri, 26 Nov 2010 14:03:55 +0000, Jamie Bennett <jamie.bennett@xxxxxxxxxx> wrote:
>> I do not want to spend more time on trying to 'sell' the idea, I'd rather be
>> fixing the problem at hand.
>
> You have a lot of people to 'sell' to in order to get this adopted
> across the organisation,
Right and hopefully pilots like this will show the benefits.
>> This is a problem that was highlighted through-out the
>> last cycle and is even more important for the coming 6 months. Its a deficiency
>> that has been an issue for everyone from engineers right through to upper
>> management and our partners, and needs to be addressed as soon as possible. To
>> that end I have put together a straw proposal at:
>>
>> https://wiki.linaro.org/JamieBennett/ProjectManagementPilot
>
> Thanks for putting this together. My main issue with it is that I think
> you have significantly underestimated the time it will take to iterate
> on the project plan.
Thats what a pilot is for, to highlight issues like this.
>> which I hope is enough to get this moving soon. I have offered to carry the
>> overhead of helping the engineer(s) to define the specification in a more project
>> management orientated way, closely monitor the project itself and produce the
>> post-mortem, this should just be a matter of selecting a project from the
>> infrastructure team and allocating a minimal amount of time for the reporting
>> overhead (all time estimations are on the above wiki page).
>
> Do you have a preference on which project to run the pilot with?
It needs to a project with 2-4 engineers participating and lasting 1-2 months,
thats the only requirements. If this isn't possible we could move to one of
the other groups such as power management or the landing teams.
> Thanks,
>
> James
Regards,
Jamie.
Follow ups
References