linaro-project-management team mailing list archive
-
linaro-project-management team
-
Mailing list archive
-
Message #00071
Fwd: 11.11 Requirements
---------- Forwarded message ----------
From: David Rusling <david.rusling@xxxxxxxxxx>
Date: Thu, Apr 14, 2011 at 6:19 PM
Subject: 11.11 Requirements
To: Linaro Tech Leads <techleads@xxxxxxxxxx>
All,
I've updated https://wiki.linaro.org/Cycles/1111/TechnicalTopics.
There are now three links for each team, a pointer to their technical
topics page, a pointer to the collated Bangalore input and a pointer
to the TSC meeting where the topics were discussed. What needs to
happen next?
[1] Ensure that all of the actions are done (these are in the meeting minutes)
[2] Ensure that nothing from Bangalore is dropped (the requirements
need to be someplace if only to be marked as 'rejected')
[3] Priorities are set as agreed in the meetings
[4] Blueprints are created
for each valid high level requirement
blueprints are created for the low level requirements (so that we
can schedule meetings in Budapest)
[1..3] needs to happen before end of next week
Kiko and I need to organise a meeting with each of you to discuss your area...
Dave
--
David Rusling, CTO
http://www.linaro.org
Linaro
Lockton House
Clarendon Rd
Cambridge
CB2 8FH