maas-devel team mailing list archive
-
maas-devel team
-
Mailing list archive
-
Message #00273
Re: Preparations for scaling out - defaulting
On Fri, May 25, 2012 at 10:26:34AM +0100, Dave Walker wrote:
> The issue is actually slightly larger than this. In the case of a
> freshly racked node we should be doing this:
> - Node is racked and powered on
> - Node is enlisted
> - Node is accepted
> - Node boots into commissioning
> - Environment tries to discover if it knows of it's own power type
Why are you doing this at commissioning rather than at enlistment?
Doesn't this create a circular dependency, since we need to know the
power and boot control methods in order to boot the node into
commissioning?
Robie
References