Hi,


IMHO this should be fixed and not tagged as whislist as this is really needed for a production environment. I agree that this is not really "a bug" in the way it doesn't cause the system to crash, but honestly, it is not "serious" to let something like that in OpenERP !

Somebody else ?

Regards,

Joël

-- 
You received this bug notification because you are a member of OpenERP
Manufacturing Experts, which is a direct subscriber.
https://bugs.launchpad.net/bugs/702288

Title:
  Cost price calculation limited to 2 levels in product bom

Status in OpenObject Addons Modules:
  Confirmed

Bug description:
  A concrete example better than a long and difficult explanation :-)

  We have the following product A composed of the product B and product B is composed from product C. So the below BOM:
  A
  -----B
  -----------C

  If the price of B is modified, then the price of A can be also modified.
  But if i modify the price of C, only B is modified and not A.

  This is a very important blocking issue, since in most of the real prod environment, we've of course more than 2 level of boms (in some customer installation, up to 100 levels !).
  So any modification at the bottom should have a consequence on all the bom structure until the top, else OpenERP cannot be used for production.