Could you please elaborate further ?

I don't get your point. This is a very old bug which has been reported
several times to OpenERP and never solved. I didn't found any partner
that didn't want this bug to be resolved, but on top of that, as stated
by other partners too, this bug makes OpenERP not usable in MRP
environment.

Of course, you can always say it's up to the partner to solve that, but
customers paid an OPW already and will not pay any additional fee to
solve a bug by the partner.

Regards.

Bertrand.

-----Original Message-----
From: bounces@xxxxxxxxxxxxx [mailto:bounces@xxxxxxxxxxxxx] On Behalf Of Antony Lesuisse
Sent: jeudi 31 mars 2011 16:03
To: Bertrand Hanot
Subject: [Bug 702288] Re: Cost price calculation limited to 2 levels in product bom

This feature should not be used. I think cost price should not be
automatically updated from cost price of bom component. What happens if
a product is listed in 2 different BOMs ?

** Changed in: openobject-addons
       Status: Confirmed => Invalid

--
You received this bug notification because you are a direct subscriber of the bug.
https://bugs.launchpad.net/bugs/702288

Title:
  Cost price calculation limited to 2 levels in product bom

Status in OpenERP Modules (addons):
  Invalid

Bug description:
  A concrete example better than a long and difficult explanation :-)

  We have the following product A composed of the product B and product B is composed from product C. So the below BOM:
  A
  -----B
  -----------C

  If the price of B is modified, then the price of A can be also modified.
  But if i modify the price of C, only B is modified and not A.

  This is a very important blocking issue, since in most of the real prod environment, we've of course more than 2 level of boms (in some customer installation, up to 100 levels !).
  So any modification at the bottom should have a consequence on all the bom structure until the top, else OpenERP cannot be used for production.

To unsubscribe from this bug, go to:
https://bugs.launchpad.net/openobject-addons/+bug/702288/+subscribe

-- 
You received this bug notification because you are a member of OpenERP
Manufacturing Experts, which is a direct subscriber.
https://bugs.launchpad.net/bugs/702288

Title:
  Cost price calculation limited to 2 levels in product bom

Status in OpenERP Modules (addons):
  Invalid

Bug description:
  A concrete example better than a long and difficult explanation :-)

  We have the following product A composed of the product B and product B is composed from product C. So the below BOM:
  A
  -----B
  -----------C

  If the price of B is modified, then the price of A can be also modified.
  But if i modify the price of C, only B is modified and not A.

  This is a very important blocking issue, since in most of the real prod environment, we've of course more than 2 level of boms (in some customer installation, up to 100 levels !).
  So any modification at the bottom should have a consequence on all the bom structure until the top, else OpenERP cannot be used for production.