[Bug 702288] Re: Cost price calculation limited to 2 levels in product bom
Fabien,
We posted almost simultaneously. The posts must have crossed.
I understand your point of view. But I don't know if I totally agree with you (yet).
It may be possible that due to legislation in some countries some use-cases can bring up problems.
But in other countries or in some industrial sectors other functionality is needed.
I have to dive in the problem/solution first to the give some
constructive feedback.
--
You received this bug notification because you are a member of OpenERP
Manufacturing Experts, which is a direct subscriber.
https://bugs.launchpad.net/bugs/702288
Title:
Cost price calculation limited to 2 levels in product bom
Status in OpenERP Modules (addons):
Invalid
Bug description:
A concrete example better than a long and difficult explanation :-)
We have the following product A composed of the product B and product B is composed from product C. So the below BOM:
A
-----B
-----------C
If the price of B is modified, then the price of A can be also modified.
But if i modify the price of C, only B is modified and not A.
This is a very important blocking issue, since in most of the real prod environment, we've of course more than 2 level of boms (in some customer installation, up to 100 levels !).
So any modification at the bottom should have a consequence on all the bom structure until the top, else OpenERP cannot be used for production.