[Bug 1014867] Re: Multilevel projects from 5.0 to 6.0 / 6.1

 

Hi Ravish,

you have marked this bug as a duplicate of lp:994272 but I disagree.
lp:99472 is a usability issue that makes it impossible to distinguish
between projects with the same name but with a different parent in a
certain place. It could be fixed by showing the full project path in the
widget.

This issue is more about reporting on related projects in the project
hierarchy. This is related to which data the various widgets take into
account, but also to the datamodel, as there is currently no clear way
of distinguishing which projects are related as they share the same
hierarchical structure as the analytic accounts (but traversing the
hierarchy until you find an analytic account that is not a project could
be a start).

Removing this duplicate mark.

Cheers,
Stefan.


** This bug is no longer a duplicate of bug 994272
   Project: ew Task from webclient, wrong project pick list

-- 
You received this bug notification because you are a member of OpenERP
Indian Team, which is subscribed to OpenERP Addons.
https://bugs.launchpad.net/bugs/1014867

Title:
  Multilevel projects from 5.0 to 6.0 / 6.1

Status in OpenERP Addons (modules):
  New

Bug description:
  I have got a huge issue with projects that I think could be considered
  a bug/regression from 5.0 to 6.0 since (if I'm not mistaken) it was
  correct in 5.0 before unifying projects and analytic accounts?

  From 6.0, projects haven't got a real project parent_id but only
  analytic account parent_id. This is right to control costs of the
  project but this way I can find these problems:

      1. System is not drawing the complet project Gantt view but only one level project Gant view.
      2. Each project computes the stimated hours of their own tasks, I can not see the real stimated hour cost in a multilevel project. Grand-child stimated hours are not computed, neither are real dedicated hours.
      3. If you set final data in a task manually, only his parent (project) is shown correctly on task gantt view. Same project in project Gantt view is not correctly drawn.

  There is more issues but these are the huges ones since I can not see the real planning for one big project.
  It's happening in both versions 6.0 and 6.1. 

  To reproduce the bug:
  I have just installed clean 6.1 nightly building, with new database only project app installed. I created 2 projects
  Parent project
     Project 1
        Task 1   Stimated 5 hours

  System is not drawing correct parent project gantt
  I can see 5 stimated hours in Project1 but not in Parent project.
  If you set final data in task 1, only his parent is shown correct on task gantt view.

  Thank you:

  Ana