[Bug 705869] Re: Work cost of subassembly is not calc to Finish good cost

 

Hello Pekka,

Thanks for the reply.
I have tested your scenario, if you set a BoM type "Normal BOM" then it will calculate only it's children cost not of it's children's children cost.
If you set a BoM type "Sets / Phantom" then it will count children's children cost.

I have created 4 product like 
A  (Make to Stock->Produce)
  B -cost price 1.0
  C -cost price 1.0 (Make to Stock->Produce)
     D -cost price 2.0
And set the product A and  C's BoM type "Sets / Phantom" and then print "Product cost Structure" and it is dispaly cost price 3.0 which is correct.

I have attached a screen-shots for your reference . So please check it.

Thanks.

** Changed in: openobject-addons
       Status: Incomplete => Invalid

-- 
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/705869

Title:
  Work cost of subassembly is not calc to Finish good cost

Status in OpenERP Modules (addons):
  Invalid

Bug description:
  Steps: Sales -> Products -> Products (serach for product) and right on
  Reoprt block "Product Cost Structure".

  Error: When printing Product cost structure for a finished good that
  has subassembly in bill of material, the work cost of the subassembly
  is not calculated into the cost of finnished good.

  What should happen: The work cost of all subassemblies should be
  calculated with subassembly material cost up to finished good.

  Test made on my local computer

  OPenERP Version 6.0.0-rc2 loaded from OpenERP homepage on 4.1.2011 to
  my computer