← Back to team overview

c2c-oerpscenario team mailing list archive

[Bug 732657] [NEW] where are flow button in manufacturing order

 

Public bug reported:

in web client, button in manufacturing order are desappear. if the MO
come from a procurement. To test :

- create a product stockable (product type) and to produce (supply) methode
- create a BoM for this product  with consumable product (from rigt pannel or Manufacturing / Master Data / Bill of Materials)
- create a minimum stock rule for this product (from right pannel or Warehouse / Configuration /Automatic Action / Minimum Stock Rules) (min 20 max100)
- launch the scheduler (Warehouse / Schedulers / Compute Shedulers).
- go to manufacturing order (manufacturing / manufacturing/ manufacturing order) and click on on line in order to go in form view

-> there are not buttons to process the MO

In GTK, there are at least  buttons  "Cance" and "Start Production"

** Affects: openobject-client-web
     Importance: High
     Assignee: OpenERP SA's Web Client R&D (openerp-dev-web)
         Status: Confirmed

** Changed in: openobject-client-web
   Importance: Undecided => High

** Changed in: openobject-client-web
       Status: New => Confirmed

** Changed in: openobject-client-web
     Assignee: (unassigned) => OpenERP SA's Web Client R&D (openerp-dev-web)

-- 
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/732657

Title:
  where are flow button in manufacturing order

Status in OpenERP Web Client:
  Confirmed

Bug description:
  in web client, button in manufacturing order are desappear. if the MO
  come from a procurement. To test :

  - create a product stockable (product type) and to produce (supply) methode
  - create a BoM for this product  with consumable product (from rigt pannel or Manufacturing / Master Data / Bill of Materials)
  - create a minimum stock rule for this product (from right pannel or Warehouse / Configuration /Automatic Action / Minimum Stock Rules) (min 20 max100)
  - launch the scheduler (Warehouse / Schedulers / Compute Shedulers).
  - go to manufacturing order (manufacturing / manufacturing/ manufacturing order) and click on on line in order to go in form view

  -> there are not buttons to process the MO

  In GTK, there are at least  buttons  "Cance" and "Start Production"



Follow ups

References