c2c-oerpscenario team mailing list archive
-
c2c-oerpscenario team
-
Mailing list archive
-
Message #24043
[Bug 781642] [NEW] [PS] It is possible to change the partner, UoS of a stock moves is Done state
Public bug reported:
trunk, revno 3401
* Warehouse/Traceability/Stock Moves, in the stock moves list view
update the partner field, the UoS,... and save
Obtained result : the system saves the changes
Expected result : this is not possible to update the information on the
stock moves (especially those in done state) neither to define a UoS
which is of the same category as the UoM (as this is forbidden on the
product form view)
reported by dha, OpenERP Prof. Serv
** Affects: openobject-addons
Importance: Medium
Assignee: OpenERP R&D Addons Team 2 (openerp-dev-addons2)
Status: New
** Tags: profserv
** Changed in: openobject-addons
Assignee: (unassigned) => OpenERP R&D Addons Team 2 (openerp-dev-addons2)
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/781642
Title:
[PS] It is possible to change the partner, UoS of a stock moves is
Done state
Status in OpenERP Modules (addons):
New
Bug description:
trunk, revno 3401
* Warehouse/Traceability/Stock Moves, in the stock moves list view
update the partner field, the UoS,... and save
Obtained result : the system saves the changes
Expected result : this is not possible to update the information on
the stock moves (especially those in done state) neither to define a
UoS which is of the same category as the UoM (as this is forbidden on
the product form view)
reported by dha, OpenERP Prof. Serv
Follow ups
-
[Bug 781642] Re: [PS] It is possible to change the partner, UoS of a stock moves in Done state
From: Fabien (Open ERP), 2011-09-24
-
[Bug 781642] Re: [PS] It is possible to change the partner, UoS of a stock moves in Done state
From: Mayur Maheshwari(OpenERP), 2011-07-15
-
[Bug 781642] Re: [PS] It is possible to change the partner, UoS of a stock moves in Done state
From: Launchpad Bug Tracker, 2011-07-15
-
[Bug 781642] Re: [PS] It is possible to change the partner, UoS of a stock moves in Done state
From: Mayur Maheshwari(OpenERP), 2011-07-15
-
[Bug 781642] Re: [PS] It is possible to change the partner, UoS of a stock moves in Done state
From: Amit Parik (OpenERP), 2011-07-15
-
[Bug 781642] Re: [PS] It is possible to change the partner, UoS of a stock moves in Done state
From: Harmel Delphine (OpenERP), 2011-05-13
-
[Bug 781642] [NEW] [PS] It is possible to change the partner, UoS of a stock moves is Done state
From: Harmel Delphine (OpenERP), 2011-05-12
References