Re: [Bug 702288] Re: Cost price calculation limited to 2 levels in product bom

 

Hi,

No update since april. I discussed this in further details with openerp
and some partner during the community days, and this is one of the main
priority in the mrp scope...

... but until now, no more details or planning.

Kind regards.

Bertrand.

________________________________________
From: bounces@xxxxxxxxxxxxx [bounces@xxxxxxxxxxxxx] On Behalf Of conexus.at [702288@xxxxxxxxxxxxxxxxxx]
Sent: Friday, July 01, 2011 12:28
To: Bertrand Hanot
Subject: [Bug 702288] Re: Cost price calculation limited to 2 levels in product bom

Hello,

may I ask about the current Status? I'm not sure if I missed something
since April.

I know we can use the product_extended Module, but we then have to
calculate the price for each bom manually.

Has there anything been done yet for calculation over n-levels of boms?


with kind regards,

--
You received this bug notification because you are subscribed to the bug
report.
https://bugs.launchpad.net/bugs/702288

Title:
  Cost price calculation limited to 2 levels in product bom

Status in OpenERP Modules (addons):
  Invalid

Bug description:
  A concrete example better than a long and difficult explanation :-)

  We have the following product A composed of the product B and product B is composed from product C. So the below BOM:
  A
  -----B
  -----------C

  If the price of B is modified, then the price of A can be also modified.
  But if i modify the price of C, only B is modified and not A.

  This is a very important blocking issue, since in most of the real prod environment, we've of course more than 2 level of boms (in some customer installation, up to 100 levels !).
  So any modification at the bottom should have a consequence on all the bom structure until the top, else OpenERP cannot be used for production.

To manage notifications about this bug go to:
https://bugs.launchpad.net/openobject-addons/+bug/702288/+subscriptions

-- 
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/702288

Title:
  Cost price calculation limited to 2 levels in product bom

Status in OpenERP Modules (addons):
  Invalid

Bug description:
  A concrete example better than a long and difficult explanation :-)

  We have the following product A composed of the product B and product B is composed from product C. So the below BOM:
  A
  -----B
  -----------C

  If the price of B is modified, then the price of A can be also modified.
  But if i modify the price of C, only B is modified and not A.

  This is a very important blocking issue, since in most of the real prod environment, we've of course more than 2 level of boms (in some customer installation, up to 100 levels !).
  So any modification at the bottom should have a consequence on all the bom structure until the top, else OpenERP cannot be used for production.