gtg team mailing list archive
-
gtg team
-
Mailing list archive
-
Message #01682
Re: [Bug 532392] Re: Start Date should not be allowed to be after the End Date
On Sun, Mar 21, 2010 at 3:37 PM, Lionel Dricot <ploum@xxxxxxxxx> wrote:
> If we have some way to provide a feedback, this is still bad because it
> is "I can't do that Dave", irrating behaviour even if you understand it.
I disagree. We're not talking about opening the pod bay doors, we're
talking about something that's not even logically possible, which
means that every time a user asks for a due date that is before the
start date they are making a mistake. It's like typing "orange" as
your birthday. Make the error message as unobtrusive as possible, but
provide an error message.
--
Start Date should not be allowed to be after the End Date
https://bugs.launchpad.net/bugs/532392
You received this bug notification because you are a member of Gtg
contributors, which is subscribed to Getting Things GNOME!.
Status in Getting Things GNOME!: Triaged
Bug description:
If a start date is set to be after a due date, the due date should be changed to reflect the start date. Currently, I have a task that starts in 11 days, but was due 15 days ago.. Yes.. I know, I am slacking with getting the task done.
References