launchpad-dev team mailing list archive
-
launchpad-dev team
-
Mailing list archive
-
Message #07878
Re: fastdowntime db deployment update
On Thu, Sep 8, 2011 at 10:26 PM, Francis J. Lacoste
<francis.lacoste@xxxxxxxxxxxxx> wrote:
> Besides testing on staging, anything you can think of blocking this?
No, there is nothing blocking Slony-I 2.0. wgrant and myself have both
been using it for testing locally, so we are pretty confident our
automation all keeps working fine.
>> We are scheduled for a real run 2011-09-09 08:30 UTC, applying our
>> backlog of database patches. The outage should be well within our 5
>> minute window. It is not yet known which parts of soyuz will be kept
>> live during the update, and which fragile parts will be shutdown for a
>> longer period.
>
> I thought we were going to apply one patch per fastdowntime session, in
> order to minimize risk? Is that still the plan? Or are we applying all
> pending patches in one go?
I want to apply them all in one go, and managed to browbeat lifeless
into that. I think there is less risk doing it this way than 7
somewhat adhoc rollouts over the next week and a half, and the patches
in the backlog are all benign and boring. My prime motivation though
is getting devel and db-devel finally back in sync as this is blocking
things within and outside of the team.
--
Stuart Bishop <stuart@xxxxxxxxxxxxxxxx>
http://www.stuartbishop.net/
Follow ups
References