launchpad-dev team mailing list archive
-
launchpad-dev team
-
Mailing list archive
-
Message #09338
Re: Devs switch to PG 9.1
On Mon, May 7, 2012 at 7:07 AM, Gary Poster <gary.poster@xxxxxxxxxxxxx> wrote:
> Stuart, thank you for the alert. When is production scheduled to switch
> to 9.1?
It isn't scheduled yet. Everything is ready to go, but we are just
waiting on everyone to wind down after the release and be comfortable
with this sort of upgrade.
Staging and qastaging are already done. ec2 images are done.
Production slaves next, then production master and buildbot.
--
Stuart Bishop <stuart.bishop@xxxxxxxxxxxxx>
Follow ups
References