← Back to team overview

launchpad-dev team mailing list archive

Re: Devs switch to PG 9.1

 

On 05/08/2012 02:11 AM, Stuart Bishop wrote:
> On Mon, May 7, 2012 at 7:07 AM, Gary Poster <gary.poster@xxxxxxxxxxxxx> wrote:
> 
>> Stuart, thank you for the alert.  When is production scheduled to switch
>> to 9.1?
> 
> It isn't scheduled yet. Everything is ready to go, but we are just
> waiting on everyone to wind down after the release and be comfortable
> with this sort of upgrade.
> 
> Staging and qastaging are already done. ec2 images are done.
> Production slaves next, then production master and buildbot.

OK cool, thanks.

I'm switching the parallel testing setup to 9.1 now because your
description sounds like the full switchover is coming very soon.  (Our
results so far--nine full test runs with 9.1--show no new problems for us.)

Gary


References