← Back to team overview

linaro-project-management team mailing list archive

Re: Action required TODAY: member update

 

Hi,

The member update goes out tomorrow US time via Joe B.

If you can take a quick scan today, please do.

Thanks,

Joey

On Tue, Mar 29, 2011 at 2:13 PM, Michael Hope <michael.hope@xxxxxxxxxx> wrote:
> Hi Joey.  I'm swamped with other things and can't reply today.  I will
> look into this over the next few days.
>
> -- Michael
>
> On Wed, Mar 30, 2011 at 4:44 AM, Joey Stanford <joey.stanford@xxxxxxxxxx> wrote:
>> Hi Gang,
>>
>> We're trying to fill in the Engineering section of the member report
>> today.  I tried to find interesting things from the past status
>> reports but only found the Android kernel and LTTng news.  Asac and
>> Jamie added a few more items. Below is what we have currently.  If you
>> have anything else that should/could go into the March update, please
>> reply back. Time is of the essence.  Thanks.
>>
>> https://docs.google.com/a/linaro.org/document/d/1o8gVwLJa-gXYUKgdfh0ilXsbrFBBv5XNnZsVHont1kU/edit?hl=en#
>>
>>
>>    * A Microsoft Kinect-wearing Linaro and Android powered robot was
>> produced which can be seen at:
>>          o http://www.youtube.com/watch?v=8EgfAk5RBVo
>>          o A copy of this robot will also be demonstated at the
>> Linaro@UDS event
>>    * A new 2.6.38 based Android kernel for panda and beagle is available at:
>>          o http://git.linaro.org/gitweb?p=people/jstultz/android.git;a=summary
>>    * A first beta preview of Linaros cloud based embedded build
>> service used for android is available at:
>>          o http://android-build.linaro.org
>>    * Multi-arch, the mechanism to install non-native library-packages
>> (ARM on x86, x86 on ARM e.t.c) was deployed to the Ubuntu archive
>>          o more information on multi-arch can be found at:
>> http://wiki.debian.org/Multiarch/Implementation
>>    * LTTng 0.245 has been ported to the linux-linaro-2.6.38 kernel
>>
>>    * A thumb2 enabled kernel build has been turned on after work by
>> both the Kernel Working Group and the Developer Platform team.
>>
>>    * The developer-focused nano image was reduced in size to 125mb,
>> plans are being discussed for this to be stripped even further to
>> enable the image to be used in simulations
>>    * Initial metrics from the patches@xxxxxxxxxx    project have be produced
>>    * A planet aggregation service bringing together Linaro
>> engineering blog posts has been deployed at:
>>          o http://planet.linaro.org
>>    * The number of boards in the validation farm increase to 10, with
>> 7 different varieties installed
>>
>