On 13 March 2012 01:27, David Zinman wrote:
>> I don't like adding new terminology.  A blueprint should be achievable
>> in a month and should be used instead of work item blocks.  Work
>> packages can be blueprint headlines - it doesn't matter that these
>> will be refined and perhaps split into the final blueprints as long as
>> there is tracability.
>
> I'm fine with that. My attempt was to differentiate a bit between
> the higher level description of the work in Papyrs and the detailed
> work items described in blueprints in order to avoid redundancy. If
> there is consensus I will change the template label to "Blueprints".
>

It seems redundant to me. A blueprint contains a higher level
description and the detailed work items to do. I'll prefer to to link
the operational/agile plan items to a blueprint when applicable.