← Back to team overview

linaro-project-management team mailing list archive

Re: [RFC] JIRA roadmap process documentation

 

On Mon, May 7, 2012 at 8:39 PM, Zach Pfeffer <zach.pfeffer@xxxxxxxxxx> wrote:
> On 7 May 2012 01:35, Ilias Biris <ilias.biris@xxxxxxxxxx> wrote:
>> On 07/05/12 03:37, Zach Pfeffer wrote:
>>>> Do we have a session to discuss this @ connect? I'm trying out using a
>>>> spreadsheet for tracking work, we've got BPs, and I think Zach makes a
>>>> good point in using Jira as the central tool. It would be nice to come
>>>> up with some organisation-wide agreement on what we want to track and
>>>> how to do it.
>>>
>>> Proposed a General Session
>>>
>>> http://summit.linaro.org/lcq2-12/meeting/20721/track-everything-with-jira/
>>>
>>> to talk about it.
>>>
>>>> ~Deepak
>>>
>>>
>>>
>>
>>
>> For the record I did propose 2 sessions: 1 to go through the information
>> in the wiki and discuss face to face, and another to brainstorm about
>> what is still needed. Both sessions mysteriously disappeared from summit
>> over the weekend so I am checking this with cjohnston. Please note that
>> I am pushing to get these sessions scheduled.
>
> Yeah, I saw the sessions on the spreadsheet, but the descriptions
> didn't include anything about replacing Launchpad so I put the other
> session up. I'm happy to drop it in favor of yours. Which one should I
> attend to talk about this?
>

I am not positive to discuss switching the operational tools (bugs,
monthly blueprints) until we have successfully transitioned our
roadmapping tool over to jira and have seen at least one successful
cycle with it being used.

Happy to have a first discussion about next steps at Q3.12 connect. By
that time I hope the roadmapping has settled and we can revisit what
we can do about the things we currently do in launchpad.


-- 
Alexander Sack
Technical Director, Linaro Platform Teams
http://www.linaro.org | Open source software for ARM SoCs
http://twitter.com/#!/linaroorg - http://www.linaro.org/linaro-blog


Follow ups

References