← Back to team overview

openerp-expert-production team mailing list archive

[Bug 596862] Re: SO/PO should be allowed to be cancelled by un-linking the concerned packing!

 

Hi guys,
   Thanks for pointing us to the right direction. However, I am a bit confused by the:

3. Remove the link of packing on related SO / PO

How do we actually do that in the GTK client? I have been trying for
days without success.

Thanks.

-- 
SO/PO should be allowed to be cancelled by un-linking the concerned packing!
https://bugs.launchpad.net/bugs/596862
You received this bug notification because you are a member of OpenERP
Manufacturing Experts, which is a direct subscriber.

Status in OpenObject Addons Modules: Fix Released
Status in OpenObject Addons 5.0 series: Fix Released
Status in OpenObject Addons trunk series: Fix Released

Bug description:
Hi,


I just realized that with the new check on the last version it's just impossible to cancel a SO when his picking has already been confirmed !!!

I mean, this should not appear in a normal flow, I agree, but what to do when you're facing this !??

To reproduce :

1. Create a SO with 1 line (no matter the configuration)
2. Confirm it, go to the packing and confirmed it (force if necessary)
3. Go back to the SO, try to cancel => It says you must cancel the packing first !
=> Normal
4. Goto to the packing, you cannot cancel it, there is no button ! The workflow doesn't allow to cancel the "done" packing !
=> Can be normal...
5. Ok, so now you try to Delete this "done" packing in order to cancel your SO and it's not possible anymore !!! Says you cannot delete a done packing

So, you cannot cancel, you cannot delete the packing... But you need one of those solutions to delete your SO !!

We do need something here to be able to cancel the SO, whatever it is.

I'll suggest to enable the workflow transition from Done to Cancel state into packing. Doing this, we'll be able to ensure who's doing that through "role" security.

Thanks,


Joël