← Back to team overview

c2c-oerpscenario team mailing list archive

[Bug 697829] [NEW] v6rc2 - calendar widget en_gb misbehaves

 

Public bug reported:

This was working well in RC1 and its broken in RC2 - windows client
downloaded from openerp.

My client locale and setting is EN_GB and so is the server locale.

The calendar fields and calendar widgets most of the time switch from UK to US format and viceversa.
 When I use any wizards with calendar fields to create a new report for example and filter by date, the default today's date will be shown dd/mm/yyyy (05/01/2011) when I click on generate report, the report will be based on the US date format - mm/dd/yyyy, so my report is blank as it queries a date in the future with no entries yet.

If I then try with the same date (05/01/2011) to click on the calendar
widget, it will show the date as 5th of May. If then I change the date
by selecting the correct one from the widget, then it will work
properly.

The same randomness applies to the other views and screens - for
example, if I manually change the date in the attendance views etc.

** Affects: openobject-client
     Importance: Undecided
         Status: New


** Tags: rc2

-- 
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/697829

Title:
  v6rc2 - calendar widget en_gb misbehaves

Status in OpenObject GTK Client:
  New

Bug description:
  This was working well in RC1 and its broken in RC2 - windows client downloaded from openerp.

My client locale and setting is EN_GB and so is the server locale.

The calendar fields and calendar widgets most of the time switch from UK to US format and viceversa.
 When I use any wizards with calendar fields to create a new report for example and filter by date, the default today's date will be shown dd/mm/yyyy (05/01/2011) when I click on generate report, the report will be based on the US date format - mm/dd/yyyy, so my report is blank as it queries a date in the future with no entries yet.

If I then try with the same date (05/01/2011) to click on the calendar widget, it will show the date as 5th of May. If then I change the date by selecting the correct one from the widget, then it will work properly.

The same randomness applies to the other views and screens - for example, if I manually change the date in the attendance views etc.





Follow ups

References