← Back to team overview

dhis2-devs team mailing list archive

[Bug 1296783] Re: TRACKER 2.15 completed program stage also completes program

 

** Description changed:

- I have a multiple even with registration program. There are 8 program
- stages. When I complete for any stage, the system automatically
- completes for the entire program. The event are not automatically
- generated so a user must create the events one after the other with
- considerable time lag between the stages.
+ I am configuring a multiple event with registration program. There are 8
+ program stages. The stages do not auto generate apart from the first
+ stage which auto-generates after enrolment (I don't seem to have a
+ choice about this). If I complete any stage e.g. (Stage 1) without
+ manually generating the next event before exiting the program stage, the
+ system automatically completes for the entire program. This creates a
+ hassle when you try to find the entity later because it is regarded as
+ having completed the Program! While it is possible to create the next
+ event before exiting the program stage instance, this would not be
+ logical because there is a considerable time lag between the stages.
  
- The system should not equate the completion of a program stage to
- quitting the program even though other stages have not been triggered.
- 
+ I don't think the system should not equate the completion of an event to
+ completion of the entire program even though other stages have not been
+ triggered. The "Quit" function should be used for this.
  
  Version:
  2.15-SNAPSHOT
  Build revision:
  14347

-- 
You received this bug notification because you are a member of DHIS 2
developers, which is subscribed to DHIS.
https://bugs.launchpad.net/bugs/1296783

Title:
  TRACKER 2.15 completed program stage also completes program

Status in DHIS 2:
  New

Bug description:
  I am configuring a multiple event with registration program. There are
  8 program stages. The stages do not auto generate apart from the first
  stage which auto-generates after enrolment (I don't seem to have a
  choice about this). If I complete any stage e.g. (Stage 1) without
  manually generating the next event before exiting the program stage,
  the system automatically completes for the entire program. This
  creates a hassle when you try to find the entity later because it is
  regarded as having completed the Program! While it is possible to
  create the next event before exiting the program stage instance, this
  would not be logical because there is a considerable time lag between
  the stages.

  I don't think the system should not equate the completion of an event
  to completion of the entire program even though other stages have not
  been triggered. The "Quit" function should be used for this.

  Version:
  2.15-SNAPSHOT
  Build revision:
  14347

To manage notifications about this bug go to:
https://bugs.launchpad.net/dhis2/+bug/1296783/+subscriptions


References