Re: FOR YOUR ACTION - TLs/PMs: close out cards [was Re: Closing out cards for 2012Q1]
Deepak,
it may help that we had a conversation in TSC about how we could have 1
to 1 sessions between the TSC and each tech leads at the next Connect,
how we can schedule that in. The problem is that it's time consuming,
but I'm wondering if Monday morning is TSC 1 to 1 day.
Based on the feedback from the last connect, we tried to maximise the
hacking time. Maybe that meant that the TSC 1 to 1 sessions got dropped.
Dave
ps I'm partial to a good rant from time to time.
On 31/05/12 08:50, Deepak Saxena wrote:
> <rant>
> I'll do this with my cards but want to express frustration with this
> whole process. We are going away from being engineering focused
> organisation to more process and less transparency that I'm not sure
> helps. Instead of being able to sit f2f with the stakeholders (TSC)
> and explain the work that my team is doing an have conversations with
> them I have to summarising it in 3 sentences and hope it captures the
> complexity of some of this work. I feel that we are trying to apply
> processes that may work great for traditional product-oriented
> development into what is essentially R&D work.
> </rant>
>
> ~Deepak
>
> On 30 May 2012 12:53, Ilias Biris <ilias.biris@xxxxxxxxxx> wrote:
>> Hello TLs/PMs
>>
>> If your cards are already marked for closing out review, then you should
>> just check them for any closing comments - for example to adjust your
>> closeouts if requested to do so.
>>
>> If your cards are not marked for closing out review - KEEP reading!
>>
>> Please fill in the close-out sections in each card (edit the card
>> description), then
>>
>> - either press the button at the top which says "Request Close-out" or
>> - if the button is not there ping me and I can help you move the card to
>> closing review
>>
>> We have a good chance to do this during the Connect week face to face,
>> so please act on it and do not wait till the last day.
>>
>> It would be great for all to turn the page and start 2012Q2 dev once we
>> leave Connect, so I'd like to close the 2012Q1 cards this week.
>>
>> thanks,
>>
>>
>> On 16/05/12 16:49, Ilias Biris wrote:
>>> Hello TLs/PMs
>>>
>>> The cards for 2012Q1 should be completed by next week (before Connect).
>>> For the list of cards which are targeted for 2012Q1 please see this
>>> (hopefully familiar) rapidboard:
>>>
>>> http://cards.linaro.org/secure/RapidBoard.jspa?rapidView=5&quickFilter=30
>>>
>>>
>>> Could you make sure at latest by THU next week (24 May) that
>>>
>>> a. 2012Q1 Cards have their closeout sections in place.
>>>
>>> For a model on the closeout check
>>> https://wiki.linaro.org/OPSCOM/RoadmapProcessWithJIRA#Delivering_a_card_-_what_to_do
>>>
>>> Once you are ready with the closeouts, make sure you press the "Request
>>> a Close-out" button at the top menu of each card closing out. If a card
>>> is in any state BUT "Engineering", and yet it has finished, then please
>>> talk to me or Loic to manage its transition to closeout review state in
>>> JIRA.
>>>
>>> b. Especially for cards which *will* have leftovers based on the
>>> acceptance criteria: in their closeout section indicate what is the
>>> missed content and propose what to do with the leftovers - ideally you
>>> should already have card(s) in the pipeline to cover the missed content
>>> in the coming quarter(s) if it is still important.
>>>
>>> If in doubt what to do please ask questions!
>>>
>>> Kind regards,
>>
>>
>> --
>> Ilias Biris ilias.biris@xxxxxxxxxx
>> Project Manager, Linaro
>> M: +358504839608, IRC: ibiris Skype: ilias_biris
>> Linaro.org│ Open source software for ARM SoCs
--
David Rusling, CTO