openerp-india team mailing list archive
-
openerp-india team
-
Mailing list archive
-
Message #13834
[Bug 1025140] Re: Subcontracting Process - Incoming shipment receives raw material sent to supplier.
Hello Amit Bhavsar,
Thanks for your reply.
Following is the configuration for finished and raw material product.
Final Product Configuration (Wire):
Product Type: Stockable Product
Procurement Method: Make to Order
Supply Method: Produce
Conductor Configuration (Conductor):
Product Type: Stockable Product
Procurement Method: Make to Order
Supply Method: Produce
Raw Material Configuration (Copper & Silver):
Product Type: Stockable Product
Procurement Method: Make to Stock
Supply Method: Buy
In case I defines supply method for conductor as buy, application generates purchase order for me also, but it that case application does not generates a delivery order of raw materials to supplier.
Thanks.
--
You received this bug notification because you are a member of OpenERP
Indian Team, which is subscribed to OpenERP Addons.
https://bugs.launchpad.net/bugs/1025140
Title:
Subcontracting Process - Incoming shipment receives raw material sent
to supplier.
Status in OpenERP Addons (modules):
Incomplete
Bug description:
Hello All,
I am facing a problem in subcontracting process in OpenERP 6.0.
I am configuring OpenERP for wire manufacturing industry and facing
problem in subcontracting process.
The Process:
In manufacturing of wire, components required are Conductor and Insulation Tape(s). Tape is manufactured in-house and for conductor raw material (Silver & Copper) is provided to supplier which in turns returns the finished conductor.
What I have configured:
I have created a finished product BOM i.e. for Wire with components as Conductor and Tape.
And for conductor manufacturing,
1. I have created a subcontracting supplier location which I have assigned in “Production Location” field in Conductor Manufacturing Routing.
2. Created a BOM for conductor manufacturing with components as Silver and Copper.
Whenever I creates a Manufacturing Order for finished product, a new
manufacturing order is generated for conductor manufacturing which is
fine, a delivery order (Silver and Copper delivery to subcontracting
supplier) which is again OK and an incoming shipment.
Till delivery order every thing is fine, but in incoming shipment
lines system shows raw material entries instead of conductor entry.
Please help, did I configured incorrectly or there this is a bug in
openERP.
Thanks in advance.
To manage notifications about this bug go to:
https://bugs.launchpad.net/openobject-addons/+bug/1025140/+subscriptions
References