c2c-oerpscenario team mailing list archive
-
c2c-oerpscenario team
-
Mailing list archive
-
Message #09043
[Bug 692962] [NEW] In hr contract, shouldn't be able to enter an end date lower than a start date
Public bug reported:
hr_contract
In Human Resources/Human Resources/Contracts, I'm able to save a
contract with a start date posterior to the end date. I shouldn't.
add an error message if the Start date > end date
** Affects: openobject-addons
Importance: Low
Assignee: OpenERP R&D Addons Team 3 (openerp-dev-addons3)
Status: Confirmed
** Changed in: openobject-addons
Importance: Undecided => Low
** Changed in: openobject-addons
Status: New => Confirmed
** Changed in: openobject-addons
Assignee: (unassigned) => OpenERP R&D Addons Team 3 (openerp-dev-addons3)
--
You received this bug notification because you are a member of C2C
OERPScenario, which is subscribed to the OpenERP Project Group.
https://bugs.launchpad.net/bugs/692962
Title:
In hr contract, shouldn't be able to enter an end date lower than a start date
Status in OpenObject Addons Modules:
Confirmed
Bug description:
hr_contract
In Human Resources/Human Resources/Contracts, I'm able to save a contract with a start date posterior to the end date. I shouldn't.
add an error message if the Start date > end date
Follow ups
-
[Bug 692962] Re: In hr contract, shouldn't be able to enter an end date lower than a start date
From: mra (Open ERP), 2010-12-22
-
[Bug 692962] Re: In hr contract, shouldn't be able to enter an end date lower than a start date
From: psi (OpenERP), 2010-12-21
-
[Bug 692962] Re: In hr contract, shouldn't be able to enter an end date lower than a start date
From: Launchpad Bug Tracker, 2010-12-21
-
[Bug 692962] Re: In hr contract, shouldn't be able to enter an end date lower than a start date
From: psi (OpenERP), 2010-12-21
-
[Bug 692962] [NEW] In hr contract, shouldn't be able to enter an end date lower than a start date
From: Aline (OpenERP), 2010-12-21
References