← Back to team overview

openshot.developers team mailing list archive

Version 1.2 Planning

 

Hello again!  Planning for version 1.2 is here, and I need everyone's help!

LaunchPad Link for Milestone 1.2.0:
https://launchpad.net/openshot/+milestone/1.2.0

We need to start gathering all of the tickets (or creating new ones) for
what will ultimately go into 1.2.  The survey
results<http://www.openshotvideo.com/2010/05/results-are-in-most-requested-feature.html>should
be used as a guide for what features are the most requested.  In
general, we should try to knock off a few of those features towards the top
of the list. =)

I would rather have too many tickets added to 1.2, than not enough.  After
we pull together a large list of possible tickets, we can go back through
the list and prioritize them.  Finally, we will kick out all of the tickets
that we don't have time, do not agree on, or just don't make sense.  That
should leave us with a good map for 1.2.  I think everyone in our team has
rights to create tickets and assign them to Milestone 1.2.0.

In about a week (or so), I would like to arrange an IRC meeting with
everyone to discuss the final list of features.  So, please think about your
availability.  If anyone wants to volunteer for arranging the IRC meeting,
please let me know.  I am no IRC expert, so I could use some help. =)

Thanks!
-Jonathan

Follow ups