← Back to team overview

ubuntu-phone team mailing list archive

Re: Landing team meeting 19.03.14

 

On 03/19/2014 06:30 PM, Robert Park wrote:
On Wed, Mar 19, 2014 at 10:26 AM, Didier Roche <didrocks@xxxxxxxxxx> wrote:
** Blocking issues for image promotion **
* flaky test failure on calendar-app (Alan/Jean-Baptiste):
https://bugs.launchpad.net/ubuntu-calendar-app/+bug/1293489
-> Chris pushed a fix for it. We are waiting for a review and release.
This one is unfortunately blocked by this bug:

https://bugs.launchpad.net/ubuntu-calendar-app/+bug/1294181

I had a look at it but I just have no idea how to resolve it (I'm not
at all familiar with calendar app's code or AP tests).
I've been speaking with kunal (upstream) about that issues. I was able to spend some time and get a trace today. The trace blows up inside qt5qml core. I'm not sure what the exact issue is either, but I have been operating on the assumption the qml changes introduced into r212 are the cause. With this basis, I've prepared 2 mp's with the same changes to fix tests; one against trunk and the other including a revert of the changes made in r212. The changes with my revert of 212 passes now, while the fixes without the revert fail with the bug above.

https://code.launchpad.net/~nskaggs/ubuntu-calendar-app/standalone-ap-for-1293489/+merge/211854
https://code.launchpad.net/~nskaggs/ubuntu-calendar-app/revert-212/+merge/211813

If we want to land the fixes to calendar we have two options as far as I see it:

1) fix the issues introduced by 212, merge to trunk, then land the merge with just the fixes.
2) merge the proposal to revert r212 and the fixes

Nicholas


Follow ups

References